All articles

On to emission-free on the N270

Learning and sharing experiences for emission-free construction

Strukton Wegen & Beton is carrying out the Reconstruction N270 project in Deurne with emission-free and low-emission equipment, mainly through the use of electric vehicles. Strukton Power advised on the determination of the right battery systems and thus contributes to solving a problem for the client.

For Strukton Power, this is one of the projects through which we develop our products for emission-free construction, in addition to the projects of Strukton Rail. With this experience and the expertise we have gained in the meantime, we know with Strukton’s various companies what emission-free construction is or should become. This teaches us to use the right products and systems, including electrical machines, battery storage systems and chargers.

Battery bank

We offer a mobile battery system that is ideal for the construction site or other events where temporary and movable energy is needed

Further info

More news

Article

Bridges and locks at Oude IJssel

Read more
Read more about Bridges and locks at Oude IJssel

Article

Coming soon: flexible energy ‘on demand’

Read more
Read more about Coming soon: flexible energy ‘on demand’

Article

A1 Electronics acquired by Gimv

Read more
Read more about A1 Electronics acquired by Gimv
All news